| Industry | Country | Title | Published Date | Deadline |
|---|---|---|---|---|
| Construction | KOREA | Replace Water Service Line Bldg# 1131, Camp Henry, Korea | 2023-05-24 | 2023-06-05 13:00 |
| KOREA | PACKING, CONTAINERIZATION AND LOCAL DRAYAGE OF DIRECT PROCUREMENT METHOD (DPM) PERSONAL PROPERTY SHIPMENTS IN AREA IV | 2023-05-24 | 2023-05-31 13:00 | |
| Other Services | KOREA | Repair existing Fire Protection System Bldg# S-327 Camp Carroll | 2023-05-23 | 2023-06-01 13:00 |
| Construction | KOREA | W90VN923R0093 Replace window glass in the sunroom at Bldg #149, Camp Walker | 2023-05-22 | 2023-06-07 13:00 |
| Manufacturing | KOREA | DPW Personal Protective Equipment (PPE) | 2023-05-22 | 2023-05-31 13:00 |
| Other Services | KOREA | Protestant Director of Music Service Osan AB, Korea | 2023-05-22 | 2023-05-05 12:59 |
| Construction | KOREA | REPLACE FILTER MEDIA IN WATER TREATMENT BUILDING 802, CFA CHINHAE, KOREA | 2023-05-19 | 2023-06-02 14:00 |
| Construction | KOREA | Repair HVAC System | 2023-05-18 | 2023-05-29 11:00 |
| Construction | KOREA | REPAIR VMF | 2023-05-18 | 2023-05-30 11:00 |
| Construction | KOREA | REPLACE BROKEN WINDOWS AT BUILDING # 308, CAMP CARROLL | 2023-05-18 | 2023-06-09 13:00 |
| Other Services | KOREA | Boiler Maintenace Service at Osan, AB | 2023-05-17 | 2023-06-12 13:00 |
| Construction | KOREA | W90VN923R0090 Replace Broken Windows at Barracks, bldg. #1611, Camp Henry | 2023-05-15 | 2023-06-05 13:00 |
| Construction | KOREA | Replace Broken Windows at Barracks #894, Camp Carroll | 2023-05-15 | 2023-05-25 13:00 |
| Construction | KOREA | Repair Maneuver Trail SLFC | 2023-05-15 | 2023-05-30 11:00 |
| Construction | KOREA | REPLACE EYEWASH STATION SYSTEM AT VARIOUS BUILDINGS, CFA CHINHAE, KOREA | 2023-05-15 | 2023-05-30 14:00 |
| Construction | KOREA | Replace HVAC Systems, Golf Clubhouse, B-387 (Republic of Korea) | 2023-05-15 | 2023-05-29 13:00 |
| Manufacturing | KOREA | NIPR Installation Supplies | 2023-05-12 | 2023-05-19 13:00 |
| Manufacturing | KOREA | Replace hood system | 2023-05-11 | 2023-05-25 13:00 |
| Construction | KOREA | Repair Airfield Deficiencies at Camp Carrol and Camp Walker. | 2023-05-10 | 2023-05-24 13:00 |
| Construction | KOREA | Repair Auto Transfer Switch (ATS) at the Gates CP Henry (Gate# 1), CP George (Gate# 3), CP Walker (Gate# 6). | 2023-05-10 | 2023-05-24 13:00 |